In 2018, funds in the amount of 89.1 billion tenge were provided as part of state programs in the Karaganda region. 88.1 billion tenge or 99% of the plan for the reporting period was mastered.
Within the framework of the State Infrastructure Development Program “Nurly Zhol” for 2015-2019, 9.9 billion tenge are allocated for the implementation of 29 projects for 2018. 100% mastered.развитие транспортной инфраструктуры – 4,1 млрд.тенге, из них:
- 0.8 billion tenge for the reconstruction of 4 bridges (3 bridges of regional significance in Bukhar-Zhyrausk and Karkaraly districts, 1 bridge of regional significance in Nurinsky district);
- reconstruction of the bridge over the Sokur River on the Karagandy-Saran-Shakhtinsk highway;
- reconstruction of the bridge over the Nura River on the Karaganda-Togyzkuduk-Botakara highway;
- reconstruction of the bridge over the Taldy River on the Karagandy-Ayaguz-Koyandy-Egindybulak-Burkutty highway;
- reconstruction of the bridge over the Kulanotpes river on the Isendy-Kenzharyk-Sonaly-Picket highway.
- 3.3 billion tenge for the implementation of 20 priority projects for the average repair of roads.
modernization of housing and communal services infrastructure and water and heat supply networks - 5.8 billion tenge for the implementation of 5 heat supply projects in the cities of Karaganda (4) and Zhezkazgan (1).
- reconstruction and modernization of heating networks in Zhezkazgan (1st stage);
- reconstruction of the main heating network M3 from Pavilion No. 5 (section from Pav. 4 to Pav. 5);
- reconstruction of the main heating network M3 from Pavilion No. 5 (section from Pav.3 to Pav.4);
- reconstruction of the main heating network UU-2 to TK-55 YuV;
- reconstruction of the M1 heating main from TK12 to NS No. 7.
In the road industry, 4 bridges were reconstructed, an average repair of 350 km of roads was carried out.
In the housing sector, 4.5 km of heating networks in Karaganda were reconstructed.
This made it possible to provide high-quality heat supply to about 1.5 thousand residential buildings or about 253 thousand residents and 217 social and cultural facilities.
State program of industrial and innovative development.
The main indicators of the program for the Karaganda region for 2018 were completed.
The share of industrial production in the region in the gross regional product amounted to 49.2%, in the manufacturing sector - 32.3%, mining - 12.8%.
The volume of industrial production since the beginning of 2018 amounted to 2566.5 billion tenge, IFO - 100.2%, including 2004.1 billion tenge in the manufacturing sector, 98.9% of the IFO.
Labor productivity increased by 4.8% compared to the corresponding period last year or 45.5 thousand. dollars per employee.
The volume of exports of the manufacturing sector increased by 6.4% (3698.5 million dollars). The number of employees in the manufacturing industry is 90.0 thousand people with an increase of 0.3% compared to the corresponding period in 2017.
468.9 billion tenge was invested in fixed assets of the region, including 127.9 billion tenge in the manufacturing sector, with an increase of 21.7% compared to the previous year.
The Entrepreneurship Support Card for 2010-2019 includes 103 projects for 785.4 billion tenge, with the creation of 11,598 new jobs, of which for 2015-2019 - 45 projects for 662.4 billion tenge with the creation of 7,002 new jobs Implemented 87 projects, the amount of investment amounted to 292 billion tenge. The enterprises created 6903 new jobs.
In the first five-year plan (2010-2014), 58 projects for 123 billion tenge were launched, 4,596 new jobs were created.
In the second five-year plan (2015-2019), 29 projects were launched for 168.9 billion tenge, 2307 new jobs were created, of which 9 projects in 2015, 9 projects in 2016, 8 projects in 2017, 8 2018 - 3 projects.
The launched projects of the Card produced industrial products for 845.9 billion tenge, including 263.4 billion tenge for 2018.
In 2018, 3 projects were launched for a total of 39.9 billion tenge, with the creation of 489 new jobs:
- “Modernization of engineering production” of Maker LLP with a design capacity of 11.9 thousand tons of products (industry - engineering). The project cost 13.7 billion tenge, 99 jobs have been created;
- “Construction of a plant for the production of cathode copper” Sary-Arka Copper Processing LLP with a design capacity of 6 thousand tons (metallurgy industry). The project cost is 14.1 billion tenge; 350 jobs have been created;
- increase in productivity of the ZIF Pustynnoye AK Altinalmas JSC with a design capacity of 2.3 million tons of ore per year, 2900 kg of gold (the industry is the production of basic precious and non-ferrous metals).
About 220 billion tenge were invested in the modernization and digitalization of production.
To date, 15 companies have the status of a member of SEZ.
There are 7 enterprises with an investment volume of 16.4 billion tenge with the creation of 668 jobs. In the process of implementation - 8 projects.
For the implementation of the State Program "Development of Education and Science" for 2016-2019, in 2018, 28.5 billion tenge was allocated.
In 2018:
- put into operation of the school in the village. Saryshagan of Aktogai district with 464 seats, microdistrict. Panel center of Karaganda for 1200 seats.
228 educational facilities were repaired. 6.3 billion tenge were allocated for this. This is 1.8 billion tenge more than 2017.
Coverage of preschool education for children from 3 to 6 years in 2018 amounted to 100% due to the opening of private preschool organizations and the development of PPPs (in 2018 - 6 with 665 seats). 8 thousand young people are covered with free vocational education, of which 6 thousand are in working professions.
In 47% of secondary schools, the introduction of elements of teaching the subjects of the natural-mathematical cycle in English began. At the initiative of the Nur Otan party, clubs for teaching English were created in 36 rural schools with the involvement of volunteers.
To increase students' interest in engineering and technical specialties, STEAM training is being introduced. There are 209 robotics classes, 71 IT-classes and 4 technology parks (Shakhtinsk, Balkhash, Karaganda, Topar, Abai district) are open, where children receive additional education in the field of new technologies.
To solve the problem of staff shortages this year for the first time 6.9 million tenge for 30 grants were allocated from the local budget for targeted training in pedagogical specialties.
203 teachers received loans for housing under the program "With a diploma - in the village."
In the conditions of Industry 4.0, special attention is paid to improving the vocational education system.
Dual training is introduced in 60% of colleges, 21% of colleges are accredited.
In accordance with WorldSkills international standards, on the basis of 8 leading colleges, centers of competencies for the development of professional skills have been created on the basis of the Karaganda Higher Polytechnic College, one of the oldest in the region - the first inter-regional industry competence center in the republic focused on the mining industry.
In 2018, as part of the implementation of the Rukhani Zhagyru program and a memorandum of cooperation with Nazarbayev Intellectual Schools, the republican forum Uly Dala Mugherleri was held for the first time, in which students and teachers of educational organizations in Zhezkazgan, Satpayev, Karazhal, Ulytau , Zhanaarkinsky areas, NIS of Karaganda.
As part of the implementation of the state health development program Densaulyk for 2016-2019, 3.3 billion tenge were allocated for 2018.
Measures were taken to immunize the population, provide the population with medicines within the guaranteed volume of free medical care, information work on the prevention of behavioral risk factors using modern information technologies, and ensure the development of the National Screening Program.
Polyclinics in the region have 37 social pharmacies.
24 healthcare facilities worth 1.6 billion tenge were repaired, including the therapeutic building of the regional clinical hospital. The restoration of the hospital campus in Zhezkazgan continues.
A rural medical ambulance station was commissioned in the village of Tugusken, Zhanaarka district. The construction of two rural medical dispensaries, as well as an emergency medical substation in the city of Karaganda, is ongoing.
2.7 billion tenge were allocated for the purchase of medical equipment.
11.5 billion tenge were allocated for free medicines for patients with chronic diseases consisting of dispensary registration, which allowed them to be provided by more than 90%. Work was carried out to modernize the infrastructure of healthcare organizations using the public-private partnership (PPP) mechanism.
Attracted more than 3 billion tenge of private investments in the health sector.
82.9 million tenge were allocated for the implementation of the State program "Development and functioning of languages".
In the reporting period, 2199 people were trained in 6 language training centers and 13 courses of Kazakh language training, 1576 people in English.
To determine the level of proficiency in the state language, 3087 people were tested on the Kaztest system.
The share of outgoing documents in the state language in the total document flow of the region amounted to 88.5%.
In the reporting period, in local, regional and republican mass media: 161 articles were broadcasted, 1240 thematic articles were published by the print media, and 610 Internet articles and posts were published on Internet resources and social networks.
14.1 billion tenge were allocated for the implementation of the State program for the development of the agricultural sector of the Republic of Kazakhstan for 2017-2021.
In crop production, the sown area of crops in 2018 amounted to 1245.4 thousand hectares, including: grain - 833.5 thousand ha (wheat - 626.5 thousand ha, barley - 176.3 thousand ha, oats - 18 , 0 thousand ha, legumes - 12.8 thousand ha), oilseeds - 17.1 thousand ha, potatoes - 14.5 thousand ha, vegetables - 2.9 thousand ha, fodder - 281.3 thousand hectares
The sown areas of wheat were increased by 2.8 thousand hectares, fodder crops (barley, oats) - by 37.7 thousand hectares, legumes - by 3.9 thousand hectares, oilseeds - by 2.0 thousand hectares.
The area of application of water-saving technology amounted to 668.9 thousand hectares, which is 11.5% more than in 2017.
In the livestock industry, there has been a tendency to increase livestock production, as well as livestock and poultry (the number of cattle has increased by 5.4% (553.8 thousand heads), horses by 10.4% (309.7 thousand heads) , poultry by 3.9% (3928.9 thousand animals), meat production (136.9 thousand tons) increased by 0.9%, and milk (465.6 thousand tons) increased by 3.5%.
94 meat and dairy farming cooperatives and 903 family feedlots were created.
Invested in agriculture 14.0 billion tenge. 212.2 thousand tons of agricultural products worth $ 60.1 million were exported.
In the agro-industrial complex, 41 investment projects are being implemented for a total amount of 31.7 billion tenge, with the creation of 804 jobs. 1 project within the framework of the Entrepreneurship Support Card, 2 - using the funds of KazAgro NMH JSC, 1 - with the participation of a foreign investor, 37 - outside the industrialization and entrepreneurship support card.
At the end of 2018, 12 projects were launched in the amount of 4.8 billion tenge, with the creation of 327 new jobs.
In 2018, 13.6 billion tenge was allocated for the implementation of the “Regional Development Program until 2020”.
In order to ensure the development of “second-level” cities in the city of Karaganda, 8 projects for the construction and reconstruction of heat and water supply systems were developed.
The implementation of the following projects has also begun in the New City Center:
- construction of a storm collector with a length of more than 3.75 km;
- Construction of the 3rd line of the M-10 heating main.
In order to create a comfortable living environment last year, 6 large squares, 15 mini-squares, 100 courtyards were landscaped.
One of the landmark projects was the improvement of the western part of the Central Park, where 140 modern LED lighting poles were installed, more than 23 thousand square meters of paving slabs were laid, more than 3 thousand square meters of a ski-roller track were equipped.
In order to develop mono and small cities:
In the city of Satpayev, the construction of supply and intra-quarter engineering networks to 107 residential buildings built for residents in the collapse zone has been completed. 13.6 km of water supply networks, 15.4 km of sewer networks, 8.9 km of heat supply networks were laid, 120 thousand square meters of asphalt concrete pavements were laid, 3 units were installed. pits KNS, 10.2 thousand meters of fences. Expansion of the carriageway was completed, installation of parking lots and asphalting of the road surface in microdistricts 1 and 2;
The landscaping of the park and the square was carried out in the city of Karazhal: the memorial sign "Independence Stella", a memorial complex dedicated to the memory of soldiers - internationalists, an entrance arch;
In the mono-and small cities of the region the condition of the transport infrastructure has been improved. The share of roads in satisfactory condition was increased (up to 35% with an increase of 4.4% of the plan) due to the repair of 324 km of roads. The degree of deterioration of sewer, heat, water supply networks (79%, 54% and 68.8%) due to reconstruction and construction of 24 km was reduced. sewer, 7.4 km. warm, 93.5 km. water networks.
Under the project “With a Diploma in the Village”, 239 specialists worth 815.8 million tenge purchased housing through budget loans, 376 specialists received lifting allowances for 63.3 million tenge.
By meetings of local communities, funds in the amount of 144.2 million tenge were allocated for the implementation of 111 projects covering 103 villages. These are repairs of 15 schools, 18.7 km. intra-village roads and lighting of 50 streets in 40 villages.
In general, the issues of housing and communal services of the region were resolved within the framework of the Nurly Zhol program and the Regional Development Program.
Over 193.6 km of water supply networks, 7.4 km, were built and reconstructed. heating networks, 38.18 km. sewer networks.
It was repaired at the expense of repayable funds of 20 railway vehicles, for a total amount of 247.4 million tenge
For the implementation of the Program of Productive Employment and Mass Entrepreneurship for 2018, 8.2 billion tenge was allocated.
In the direction “Providing program participants with technical and vocational education and short-term vocational training”, training of personnel with technical and vocational education, taking into account the needs of the labor market, amounted to 700 people; Short-term professional training of workers in professions and skills that are in demand on the labor market - 3131 people.
As part of the second direction, “Development of Mass Entrepreneurship,” 2071 people were trained in the basics of entrepreneurship under the Bastau Business project.
1108 people planning to implement business projects received microloans.
In the direction "Development of the labor market through the promotion of employment and labor mobility" 1031 social jobs were created, 1232 people were sent to youth practice.
12.7 million tenge have been disbursed for information work.
Since 2010, under the Unified Business Support and Development Program “DKB-2020”, 1,576 projects worth 171.6 billion tenge have been supported, including 172 projects worth 11.0 billion tenge in 2018:
- 1101 projects for subsidizing interest on loans (1 and 3 directions), including 99 in 2018;
- partial loan guarantee - 233 projects, including 54 in 2018;
- to summarize the missing infrastructure - 66 projects, including 5 in 2018;
- on grant financing - 176 projects for 0.4 billion tenge.
The result is the preservation of 73.7 thousand available jobs and the creation of 21.4 thousand new ones, including in 2018, 4239 jobs were saved and 2201 new jobs were created.
Within the framework of the Nurly Zher Housing Construction Program, the construction of credit and rental housing, the equipping of engineering and communications infrastructure for 7.2 billion tenge are envisaged.
At the end of 2018, 416.7 thousand square meters were commissioned. housing with an increase of 11.4% by 2017 (4 135 apartments).
1749 apartments were built due to state investments, which is 2.3 times more than the previous period.
 

Дата cоздания: 17 Апреля 2015 10:54
Дата редактирования: 25 Ноября 2019 09:06
Послание Главы государства Касым-Жомарта Токаева народу Казахстана 2 сентября 2019
Официальный сайт президента Республики Казахстан
Стратегия Казахстан 2050 Наша сила
Официальный сайт премьер министра Республики Казахстан
Полезные ссылки
Показать всю карту сайта